Greenbank Terotech Header 01Greenbank Terotech Header 02Greenbank Terotech Header 03
Greenbank Terotech Header 04Greenbank Terotech Header 05Greenbank Terotech Header 06
Greenbank Terotech Header 07

June 29 2007
Greenbank Unveils
Open Top Splitter Box
for the Coal Preparation Society

30 Aug 2007
Greenbank shows their
New Ceramic Bonding Process
at AIMEX

Ceramatech logo
alumina shapes

Ceramatech Advert

 

Greenbank Terotech Menu 01Greenbank Terotech Home ButtonGreenbank Terotech Menu 02Greenbakn Terotech Products ButtonGreenbank Terotech Menu 03Greenbank Terotech Search ButtonGreenbank Terotech Menu 04Greenbank Terotech Contact Us buttonGreenbank Terotech Menu 05Greenbank Terotech HM Group Home ButtonGreenbank Terotech Menu 07
Greenbank Terotech Header 08
Chemical Resistant Alumina Bonding
GT Blome 2

GT Blome 2 is a two component, sodium silicate based mortar used for installing chemical and abrasion resistant brick and tile linings. GT Blome 2 offers excellent bond strength to dense alumina ceramic and cast basalt wear resistant tiles.

Applications
GT Blome 2 is designed for use as a mortar for installing abrasion resistant brick and tile in various applications. These applications include:

  • Ceramic Linings
  • Basalt Linings
  • Coal Piping Systems
  • I.D. Fans
  • Burner Nozzles
  • Ore Handling
  • Chutes & Hoppers
  • Coke Handling

Note: GT Blome 2 is not recommended for use in neutral water or alkali service. Consult Greenbank Terotech Pty. Ltd. for specific recommendations on other chemical resistant mortars.

Benefits

Corrosion resistant - GT Blome 2 has good resistance to dilute acids and solvent.

Temperature resistant - GT Blome 2 is suitable for service at temperatures up to 1000°C.

Easy to use - GT Blome 2 is highly thixotropic and exhibits excellent trowelability for butteringbrick or tile.

Chemical settings - GT Blome 2 cures by internal chemical set and will cure completely as a bed joint for dense, non-porous brick and tile linings.

Special low temperature cure grade available - GT Blome 2-7 Powder is available for use in temperatures as low as 20°C. GT Blome 2-7 Powder when mixed with GT Blome 2 liquid exhibits the same
properties as GT Blome 2 .

Curing Rates
Temperature......................21°C
Pot life..............................45 minutes
Initial set...........................6 hours
Final cure..........................3 days minimum

These curing rates are accurate at 21°C; lower temperatures will retard the cure and higher temperatures will accelerate it. It is recommended that brick and tile linings installed by GT Blome 2 as the bonding mortar be allowed to cure for a minimum of three (3) days at 21°C before being put into service. Following these curing procedures, it is recommended that all lined fabrications be protected from water and weather as GT Blome 2 has limited water and moisture resistance.

Properties
Acid resistance.................Good
Solvent resistance.............Good
Absorption........................9.0%
pH range for use................0.0-6.0
Shrinkage.........................1.1%
Density.............................112 pcf
Material colour...................tan/gray

Packaging
GT Blome 2 cement is packaged as a two-part product consisting of a filler powder and a liquid binder. Components are packaged as follows:

GT Blome 2 Powder..........22.7kg. bags
GT-BLOME 2 Liquid..........22.7kg. pails
.......................................272kg. Drums

Caution
GT Blome 2 powder and liquid and mixes of them may present various health hazards if handled improperly. Handle with care and read and abide by the product safety label found on each unit and the Material Safety Data Sheet that is available for this product.